The house gets a facelift!
Sunday, November 7, 2010
A whole new side of the house
The insulation was sprayed in last week and drywall has begun to be put up. The plumber has been putting together the heating system and we should be firing it up later this week. John and Tom have been assembling the exterior window casing and applying it to the windows. They also started installing the Hardie Plank siding in Harris Cream. Check out the pictures.
Downstairs bathroom
Kitchen
Living room
Guest room
Master bathroom
Heating system
Siding and Trim
Downstairs bathroom
Kitchen
Living room
Guest room
Master bathroom
Heating system
Siding and Trim
Sunday, October 24, 2010
Almost roughed-in
The plumber and electrician are almost complete roughing in. I helped John (our builder) rough-in the central vacuum on Saturday and Katie and I did some gardening today. We seeded most of the lawn to see if anything would grow before the snow falls and planted some bulbs for Spring blooming. The insulation installers are coming Thursday to blow in the closed cell foam. Here is a photo or our back steps (another one of my slick ideas!). These rocks came from excavating the hole for our foundation ;)
Tuesday, October 12, 2010
Lots to post about
Electricity has been brought to the house, water line has been brought to the house, there are lots of things to post about today! All of the windows are in, all of the interior wall partitions are done, and the chimney was finally done last week! The septic system was inspected and backfilled today so there isn't a field of stone in the backyard anymore. We've got the plumber coming in this week to start the rough-in and electrician next week. Check out the pics below!
Katie's closet
Mike's closet
Katie's closet
Mike's closet
Thursday, September 23, 2010
Chimney almost complete
Monday, September 20, 2010
There used to be a driveway here
Thursday, September 16, 2010
Fireplace
Wednesday, September 15, 2010
Almost weather tight
Monday, September 13, 2010
We have water and poles...
The telephone company came out last week to put in the two poles we'll need for service and the well was drilled on the same day. Roof rafters are up and the roof has been sheathed. Shingles come next! The mason has started working his way up the house with the chimney and has completed work in the basement. He will be laying the hearth and continuing up through the second floor this week. Check out the pics...
Wednesday, September 8, 2010
Roof's a'comin